Panel Upgrades Seattle

Why Upgrade to 200-Amp Service?

Panel upgrades Seattle services to:

⚡ Eliminate Overloads – Power high-wattage devices (AC, EVs, induction stoves) simultaneously
🔌 Support Modern Living – Add circuits for home offices, workshops, or future expansions
🏡 Increase Home Value – A must-have for buyers in today’s market
⚡ Enhanced Safety – Replace outdated fuse boxes or aging panels prone to overheating
💡 Smart Home Ready – Compatible with solar panels, battery backups, and automation systems

Contact Us

Call Us

+4252456351

Panel Upgrades Seattle– 100A → 200A for Modern Power Needs Future-Proof Your Home’s Electrical System

Older homes with 100-amp panels struggle to keep up with today’s power demands. Upgrading to a 200-amp service ensures safe, reliable electricity for modern appliances, EV chargers, and smart home systems—without tripped breakers or overloaded circuits.

At Most Wanted Electric, we specialize in seamless panel upgrades that meet current codes and expand your home’s capacity for decades to come.

Our 200-Amp Panel Upgrades Seattle Process

1. Load Assessment & Planning
We evaluate your home’s current and future power needs, including planned renovations or EV charger installations.

2. Utility Coordination & Permits
We handle all paperwork, including utility disconnect/reconnect and city permits.

3. Panel & Meter Base Installation

  • Replace your old panel with a new 200-amp main breaker panel (Square D, Eaton, Siemens, etc.)

  • Upgrade the meter base and service entrance cables if needed

  • Install whole-house surge protection (recommended)

4. Circuit Migration & Testing
Carefully transfer existing circuits to the new panel, then test all connections for safety and performance.

5. Final Inspection & Walkthrough
We ensure everything meets NEC codes and explain your upgraded system’s features.


Ideal Candidates for a Panel Upgrades Seattle

  • Homes with 60A or 100A panels (common in pre-1980s builds)

  • Owners adding EV chargers, hot tubs, or major appliances

  • Renovations or expansions requiring new circuits

  • Fuse box systems (obsolete and hazardous)


Brands We Install

✔ Square D (Schneider Electric)
✔ Eaton/Cutler-Hammer
✔ Siemens
✔ Leviton
✔ General Electric (GE)
We also upgrade outdated Federal Pacific, Zinsco, or Challenger panels—known fire hazards.

Frequently Asked Questions (FAQ)

Typically 1-2 days, depending on utility scheduling and panel complexity.

Yes—for 4–8 hours while we swap panels. We’ll coordinate timing to minimize disruption.

Not usually—but we’ll inspect your existing wiring and recommend updates if needed.

Absolutely. We’ll migrate them to the new panel and label everything clearly.

Yes—and we pull all permits for you.